Picture of the Month – July 2023 This months picture..,. Bulleid Merchant Navy 21c14 approaches Salisbury platform 2 past Fisherton Sarum with a summer service from the west of England. Share this:TwitterEmailLinkedInFacebookLike this:Like Loading...
A lovely scene enhanced by the signals. Can you give some information about their construction, please? Loading... Reply
Thanks. See here https://southern-railway.com/2013/09/30/a-view-from-the-line-12-the-pressure-of-signalling-the-line/ Loading... Reply
Just like being there. The only sad thing is that the train is taking holidaymakers back to Waterloo, and not away to start their holidays! Loading... Reply
There could be trouble if it’s going into platform 3, it might meet a Bristol train coming the other way Loading... Reply
It’s correctly signalled into platform 2 the main SR up platform, the lower left arm is for platform 1 (usually used by eastbound GWR services). Platforms 3 and 4 were the down platforms. Loading... Reply
Only Bulleid’s in that rake. See here for more details https://southern-railway.com/2014/01/10/talking-stock-27-4mm-bulleid-coaches-new-r-t-r-on-the-way/ Loading...
After the safe fitted PLV (to use the SR term) It is Bulleid three coach L set 771 and a two coach R set 63. The PLV is a modified Parkside kit to add the safe and the Bulleid coaches are BSL/Phoenix kits. See here for more details https://southern-railway.com/2014/01/10/talking-stock-27-4mm-bulleid-coaches-new-r-t-r-on-the-way/ Loading... Reply
What an excellent start to July!
A lovely scene enhanced by the signals. Can you give some information about their construction, please?
Thanks. See here https://southern-railway.com/2013/09/30/a-view-from-the-line-12-the-pressure-of-signalling-the-line/
what a super pic!
Just like being there. The only sad thing is that the train is taking holidaymakers back to Waterloo, and not away to start their holidays!
There could be trouble if it’s going into platform 3, it might meet a Bristol train coming the other way
It’s correctly signalled into platform 2 the main SR up platform, the lower left arm is for platform 1 (usually used by eastbound GWR services). Platforms 3 and 4 were the down platforms.
Great shot, Graham! What’s does the train consist of after the PMV?
a mix of Bulleids and mostly Maunsells
Only Bulleid’s in that rake. See here for more details https://southern-railway.com/2014/01/10/talking-stock-27-4mm-bulleid-coaches-new-r-t-r-on-the-way/
After the safe fitted PLV (to use the SR term) It is Bulleid three coach L set 771 and a two coach R set 63.
The PLV is a modified Parkside kit to add the safe and the Bulleid coaches are BSL/Phoenix kits.
See here for more details https://southern-railway.com/2014/01/10/talking-stock-27-4mm-bulleid-coaches-new-r-t-r-on-the-way/
Showing post-WW2 track alignment standards ? That much realism . . . ?
I model 1946 to 1949