A weekend at home for a change has seen some progress made on my new little timesaving / timewasting project Canute Road Quay. This post brings you up to date with that progress, further buildings have been added and a start made on the inset quayside trackwork.

Firstly taking on board an excellent suggestion made by a friend and fellow Southern enthusiast Ian (Olddudders) on RMweb of adding a pub into the scene to be somewhere to quench the thirst of, and allow some of the cash be spent on pay day of, the hardy dock workers; I have therefore sourced and added a couple more suitable Bachmann Scenecraft low relief buildings next to the bonded warehouse.

The first one being the ‘Waterloo Taven’ and another being a stores building that was originally a garage, but I have already removed the petrol pump and branding but haven’t touched up the paint work up yet. A small alleyway is between these buildings behind the gate.
I have also removed the platform from the bonded warehouses to lower them in height and also due to the fact that I am locating then facing on to a roadway rather railway line.

I have made a start on the inset quayside trackwork, which will represent a concrete finish once complete. Firstly I added check rails inside the running rails, by super-gluing lengths of rail to the sleepers. The first layer of 2.5mm cork has been glued down either side of the track, and also a strip added between the check rails. The next stage will be add a second layer of 1.5mm cork on top of the base layer that will also extend right up to the outside surface of the running rails totally covering the sleepers. Any gaps will be filled using filler before scribing section lines to represent the panels of concrete and expansion gaps then painting a weather concrete and weeds and such like added.

The front buildings representing a quayside office building and a larger warehouse and loading platform have also started to take shape. For these building I am using laser cut card components from LCut Creative. I have been very impressed with the quality and detail of these kits, they assemble very easily, using PVA woodglue and as they come in sections of common key dimensions they are easily adaptable to suit the location, as I have done here using a number of different kits combined to give the effect I am after.

These are currently still in sections with the upper floor of the warehouse building and the loading platform just being rested in place until I have added the internals floors and partitions, but the effect they give is starting to take shape.
In the very back corner can be seen the small engine shed with its Hornby Scaledale coal stage and Kernow Model Rail Centre SR style water crane, the shed itself is taking shape from a resin kit from Skytrex Model Railways.
I hope to make further progress over the Christmas break; with continued progress on the buildings, inset trackwork and the fixing of an overcast sky photographic backscene; and will keep you suitably posted via this blog.
Reblogged this on sed30's Blog.
Looking good Graham. My offer for Worthing exhibition still stands
Thanks Dave I will keep you posted on the build and will be more than happy to bring it to Worthing
I lived in the Southampton area from the late 70s until the noughties and remember a lot of the dockyard lines were still in place, so this has a lot of resonance with me.