Workbench Witterings#19 Building a Maunsell 350HP ‘trip’ locomotive

In my Talking Stock#15 post here I discuss the background to the three Maunsell 350HHp diesel 'trip' locomotives. In 1937 Maunsell ordered three six coupled 350hp diesel electric locos, built by the SR at Ashford with English Electric power units, to compare against the Z class 0-8-0 tanks.  They were numbered 1,2 an d 3. These … Continue reading Workbench Witterings#19 Building a Maunsell 350HP ‘trip’ locomotive

Model Rail Magazine / Heljan to produce Class 12 (and Class 11) 350HP diesel 0-6-0 shunters

Model Rail Magazine have announced via their August 2019 issue, No. 263, that they have commissioned Danish manufacturer Heljan to produce the Class 12, 350hp diesel 0-6-0 shunters along the with the War Department, LMS / GWR Class 11 versions. Twenty six of the shunters, with English Electric 350hp engines, that became Class 12 were … Continue reading Model Rail Magazine / Heljan to produce Class 12 (and Class 11) 350HP diesel 0-6-0 shunters

Talking Stock #15 Maunsell 350HP diesel ‘trip’ locomotives

And now for for something slightly different... Along with the other railway companies at the time , the Southern Railway, during the 1930's, were also looking for the future of locomotive power. In 1937 Maunsell ordered three six coupled 350hp diesel electric locos, built by the SR at Ashford with English Electric power units, to compare against the … Continue reading Talking Stock #15 Maunsell 350HP diesel ‘trip’ locomotives