The station building for Westhill Road is now nearing completion, since my last Workbench Witterings#20 post here, with a little help from my friends I have added the bonnet tiles to the hipped ridges, the roof plumbing and details such as downpipes along with completing the painting. I believe it is important to get the … Continue reading Workbench Witterings #23 Bonnet tiles, roof plumbing and painting putting the finishing touches to Westhill Road’s station building
Category: Westhill Road Ramblings
Workbench Wittering#20 Out on the tiles and going potty with chimneys, Westhill Road’s station building continues to take shape
The build of the station building for Westhill Road continues, since my last Workbench Witterings#18 post here work on the hipped roof and the characteristic chimneys of the mirrored inspiration of Alverstone, for this build. Hipped roofs, and the gable windows, can be quite complex to work out the correct angles and lengths to cut roof … Continue reading Workbench Wittering#20 Out on the tiles and going potty with chimneys, Westhill Road’s station building continues to take shape
Workbench Witterings #18 Not a pane yet, Westhill Road’s station building takes shape
Has it really been August since my Workbench Witterings#16 The Foundations of the Westhill Road station building? I have at last been able to do some more work on it today, starting with a the upper floor windows. As I have been unable to find any proprietary windows from the usual sources, including from laser … Continue reading Workbench Witterings #18 Not a pane yet, Westhill Road’s station building takes shape
Westhill Road Ramblings#1 3B or not 3B choosing a signal box
Welcome to the first of my Westhill Road Ramblings as I think thoughts (or why isn't that thunk?), yes dangerous I know, to develop the concept in my mind / imagination and start to make actual physical progress on my new little scenic diorama type layout. To read my introduction to Westhill Road click here. … Continue reading Westhill Road Ramblings#1 3B or not 3B choosing a signal box